Building information modeling: Difference between revisions

Content deleted Content added
BIM in construction management: Fixed typo in citation title.
Tags: Reverted Mobile edit Mobile web edit
Restored revision 1279471539 by GreenC bot (talk): Rv apparent citespam / promo
Line 71:
 
Quantities and shared properties of materials can be extracted easily. Scopes of work can be isolated and defined. Systems, assemblies and sequences can be shown in a relative scale with the entire facility or group of facilities. BIM also prevents errors by enabling conflict or 'clash detection' whereby the computer model visually highlights to the team where parts of the building (e.g.:structural frame and building services pipes or ducts) may wrongly intersect.
 
Recent studies have demonstrated the integration of BIM with augmented reality (AR) to enhance civil infrastructure inspections. This approach enables real-time visualization of damage and supports collaborative decision-making between on-site and remote users.<ref name="Awadallah2024">{{cite journal |last1=Awadallah |first1=Omar |last2=Sadhu |first2=Ayan |last3=Grolinger |first3=Katarina |title=Remote collaborative framework for real-time structural condition assessment using Augmented Reality |journal=Advanced Engineering Informatics|volume=62 |year=2024 |pages=102652 |doi=10.1016/j.aei.2024.102652 |url=https://www.sciencedirect.com/science/article/pii/S1474034624003008 }}</ref>
 
===BIM in facility operation and asset management===