Workforce modeling: Difference between revisions

Content deleted Content added
m De-capitalizing word 'Modeling' into 'modeling' within bold name 'Workforce modeling'
Uu12345xy (talk | contribs)
m Add no sourced section
Line 8:
 
==Definition==
{{Unreferenced section|date=May 2025|small=y}}
The term can be differentiated from traditional staff [[Schedule (workplace)|scheduling]]. Staff scheduling is rooted in [[time management]]. Besides demand orientation, workforce modeling also incorporates the forecast of the workload and the required staff, the integration of workers into the scheduling process through interactivity, and analysis of the entire process.