=== Emergency control ===
In the event of a significant [[grid contingency]], like a major loss of generation capacity, emergency measures might be necessary to avoid a [[cascading failure]]. [[Load shedding]] (LS) is a standard emergency control action that reduces demand by disconnecting certain loads within an acceptable timeframe (0.2 - 3 seconds), thereby preventing the collapse of the grid.{{sfn|Bevrani|Watanabe|Mitani|2014|p=158}}
== Time control ==
|