Content deleted Content added
m →Dispatch curve: 50% |
→Minutes-ahead operation: Expanding article |
||
Line 41:
== Minutes-ahead operation ==
In the minutes prior to the delivery, a system operator is using the [[power-flow study]] algorithms in order to find the [[optimal power flow]]. At this stage the goal is reliability ("security") of the supply
== Control after disturbance ==
|