Content deleted Content added
JHR Dailies (talk | contribs) mNo edit summary Tags: Reverted Visual edit: Switched |
JHR Dailies (talk | contribs) Maps updates Tag: Reverted |
||
Line 10:
| map = [https://umap.openstreetmap.fr/en/map/jalur-tol-trans-jawa_1242386 Peta interaktif Jalur Tol Trans-Jawa di uMap]
| image = Interconnection of Trans-Java Toll-Roads (EN) (June-2025-Updates).svg
| image_notes = Interconnection of Trans Java Toll Road per June 2025
| direction_a = West
| terminus_a = [[Merak, Banten|Merak]]
Line 72 ⟶ 73:
As of 2023, the only uncompleted portions of the Trans-Java Toll Road is the section between [[Probolinggo]] and [[Banyuwangi]]. The 170 km section, which would connect both Java coast, is currently under construction at a slow pace due to several problems, mainly arising from land ownership.<ref>{{Cite news|url=https://ekonomi.bisnis.com/read/20221018/45/1588881/ini-alasan-jalan-tol-probolinggo-banyuwangi-belum-tersambung|title=Ini Alasan Jalan Tol Probolinggo-Banyuwangi Belum Tersambung|first=Muhammad|last=Ridwan|editor-first=Fitri Sartina|editor-last=Dewi|date=18 October 2022|access-date=7 February 2023|___location=Nusa Dua|work=Bisnis|language=id}}</ref>
== Maps ==
=== Latest Updated Map ===
The following are the map of Trans Java Toll road as per '''June 2025''' :
[[File:Interconnection of Trans-Java Toll-Roads (EN) (June-2025-Updates).svg|pus|700x700px|al=Interconnection of Trans Java Toll Road in June 2025]]
=== Previous Map ===
As reference, these was the previous map of Trans Java Toll road on '''July 2020''' :
[[File:Trans-Java_Toll_road_id.svg|pus|700x700px|al=Trans Java Toll Road map on July 2020]]
== Main route ==
|