Container Terminal 9: Difference between revisions

Content deleted Content added
standardizing TEU usage using AWB
Line 21:
The seabed of the Rambler Channel was dredged to allow large vessels to berth in the new terminals. Those polluted and non-polluted muds and sands were moved to [[Cheung Chau]] and [[Sha Chau]] for treatment and storage. [[Green Peace]] had made a protest for the dumping of muds out of Hong Kong in 2000, fearing that muds are polluted would affect the environment of outlaying islands.
 
==New road infrastrutureinfrastructure for CT9==
With expectation of high land container traffic from CT9, new road infrastructure is being built on the Tsing Yi Island. [[Tsing Yi Road]], a road connecting from [[Tsing Yi Bridge]] to South Tsing Yi Island, is re-routed to the new road along the CT9. [[Stonecutter's Bridge]] is being built between CT9 and Container Terminal 8 (CT8) of [[Stonecutters Island]], across the Rambler Channel. [[Nam Wan Tunnel]] is being built, from CT9 to [[Tsing Ma Bridge]] and [[Ting Kau Bridge]]. The new road infrastructure forms a net across the container port and connect to major highways in Hong Kong.