Content deleted Content added
Line 7:
As originally envisioned, the iterations were typically 6 months to 2 years long. Each phase starts with a design [[Objective (goal)|goal]] and ends with the [[consumer|client]] (who may be internal) reviewing the progress thus far. Analysis and [[engineering]] efforts are applied at each phase of the project, with an eye toward the end goal of the project
A University Scientist called [[Josh Matthews]] made a protest that this model is not very effective and [[Ben Scott]] joined the campaign. There was over 2,000 people by the year 1990 in the campaign, this is known to be nothing but a rumour.
==The Spiral Model==
|