Process-data diagram: Difference between revisions

Content deleted Content added
Lay out
Wikification
Line 1:
[[Image:PDD.jpg|thumb|280px|right|The process data diagram]]
A '''process-data diagram''' is a [[diagram]] that describes [[process]]es and [[data]] that act as output of these processes. On the left side the [[meta-process model]] can be viewed and on the right side the meta concept model can be viewed.

A process-data diagram iscan abe seen as combination of an [[activitybusiness diagram]] or [[process diagrammodel]] and a [[flowchartdata model]].
 
== Overview ==
The process-data diagram that is depicted at the right, gives an overview of all of these activities/processes and deliverables. The four gray boxes depict the four main [[implementation]] phases, which each contain several processes that are in this case all sequential. [[Image:SAP_Implementation_process-data_diagram.png|280px|right|thumbnail|SAP Implementation process-data diagram]] The boxes at the right show all the deliverables/[[concept]]s that result from the processes. Boxes without a shadow have no further sub-concepts. Boxes with a black shadow depict complex closed concepts, so concepts that have sub-concepts, which however will not be described in any more detail. Boxes with a white shadow (a box behind it) depict open closed concepts, where the sub-concepts are expanded in greater detail. The lines with diamonds show a has-a relationship between concepts.
 
The [[SAP implementationImplementation]] process is made up out of four main phases, i.e. the project preparation where a vision of the future-state of the SAP solution is being created, a sizing and blueprinting phase where the solution stack is created and [[training]] is being performed, a functional development phase and finally a final preparation phase, when the last [[Software testing|tests]] are being performed before the actual go live. For each phase, the vital activities are addressed and the [[deliverable]]s/[[Product (business)|product]]s are explained.
 
 
 
== Process-data diagram buidling blocks ==
== Basics ==
=== Sequential activities ===
{{main|Activity diagram}}
Line 137:
* [[Implementation Maturity Model Assessment]]
* [[Managing Stage Boundaries (SB)]]
* [[Market driven requirements engineering for software products]]
* [[Metadata modeling]]
* [[Object Process Methodology]]
Line 143 ⟶ 142:
* [[Product Family Engineering]]
* [[Product Structure Modeling]]
* [[SAP Implementation]]
* [[Synchronization model]]
 
== References ==
{{unreferenced}}
 
[[Category:Diagrams]]