Talk:V-model (software development): Difference between revisions

Content deleted Content added
No edit summary
mNo edit summary
Line 20:
 
[[User:Achilles852|Achilles852]] ([[User talk:Achilles852|talk]]) 02:09, 5 February 2009 (UTC)
While I agree with the two views above. I was just wondering if I'm misinterpreting it in thinking that there should be a line from "Architectural Design" Phase in the Image leading into "Integration Testing" - which would mean that Integration tests are prepareddesigned during "Architectural Design"? because that is exactly what "Architectural Design" states i.e. "The integration testing design is carried out in this phase."