Three-point estimation: Difference between revisions

Content deleted Content added
Change SD formula to show "^2" (squared) rather than simply "2"
split sentence to increase readability
Line 13:
: SD = (''b'' − ''a'')/6
 
''E'' is a [[weighted average]] which takes into account both the most optimistic and most pessimistic estimates provided and. SD measures the variability or uncertainty in the estimate.
 
To produce a project estimate the project manager: