Content deleted Content added
m Bot: Adding Orphan Tag (Questions) (Report Errors) |
|||
Line 25:
* The upside down funnel is filled up with fresh concrete
* The upside down funnel is lifted up and the concrete flows
* The flowtable will be lifted up several centimeters and will be dropped. These commotions will make the
* After this the diameter of the concrete is measured with a yardstick. The result is called "Ausbreitmaß" in German.
|