Linear scheduling method: Difference between revisions

Content deleted Content added
m Wikify
SmackBot (talk | contribs)
m Date maintenance tags and general fixes
Line 1:
{{Unreferenced|date=November 2007}}
 
'''Linear Scheduling Method''' (LSM) is a graphical scheduling method focusing on continuous resource utilization in repetitive activities. It is believed {{whoWho|date=August 2009}} that it originally adopted the idea of [[Line-Of-Balance method]].
 
==Application==
Line 26:
* David W. Johnston [http://cedb.asce.org/cgi/WWWdisplay.cgi?5016289 Linear Scheduling Method for Highway Construction]
 
{{DEFAULTSORT:Linear Scheduling Method}}
[[Category:Network theory]]
[[Category:Project management]]