Content deleted Content added
No edit summary |
No edit summary |
||
Line 5:
It is installed on several sections of the United Kingdom's busiest motorways, such as the congested western stretch of the [[M25 motorway]] and much of the [[M60 motorway]] around [[Manchester]], the Birmingham box (M6, M5 and M42) and the system has successfully reduced accidents.<ref name="hacost">{{cite_web|url=http://www.ha-research.co.uk/projects/index.php?id=437|title=Cost effectiveness of MIDAS|publisher=Highways Agency |accessdate =2007-01-07}}</ref>
The system replaced the
By March 2006, the [[Highways Agency]] aims to have MIDAS installed on more than {{convert|910|km|0}} of the English motorway network.{{specify}}
|