Engineering validation test: Difference between revisions

Content deleted Content added
No edit summary
Tag: categories removed
Removed shameless product plug
Line 14:
In the Prototyping stage, engineers create actual working samples of the product they plan to produce. Engineering Verification Testing (EVT) is used on prototypes to verify that the design meets pre-determined specifications and design goals. This valuable information is used to validate the design as is, or identify areas that need to be modified.
 
Percept's proven EVT testing process helps clients to quickly identify and resolve design issues early in the design cycle, improving future product performance while saving time and money.
 
--------------------------------------------------
Line 34 ⟶ 33:
 
After prototyping, the product is moved to the next phase of the design cycle: Design Refinement. Engineers revise and improve the design to meet performance and design requirements and specifications. Design Verification Testing is performed to deliver objective, comprehensive testing verifying all product specifications, interface standards, OEM requirements, and diagnostic commands.
 
Percept's thorough, objective DVT methodology delivers objective, comprehensive testing to verify all product specifications, interface standards, OEM requirements, and diagnostic commands.