Content deleted Content added
Biscuittin (talk | contribs) tidy up |
Biscuittin (talk | contribs) heading |
||
Line 12:
* Basic parametric measurements, specification verification
==Importance==
Identifying design problems and solving them as early in the design cycle as possible, is key to keeping your project on time and within budget. Too often, [[product design]] and performance problems are not detected until late in the [[product development]] cycle — when you're getting ready to ship your product. The old adage holds true: Its costs a penny to make a change in engineering, a dime in production and a dollar after a product is in the field.
In the [[Prototyping]] stage, engineers create actual working samples of the product they plan to produce. Engineering Verification Testing (EVT) is used on prototypes to verify that the design meets pre-determined specifications and design goals. This valuable information is used to validate the design as is, or identify areas that need to be modified.
==
Design Verification Test (DVT) is an intensive testing program consisting of five areas of testing:▼
▲DVT is an intensive testing program consisting of five areas of testing:
* Functional Testing (including usability)
|