Operational acceptance testing: Difference between revisions

Content deleted Content added
No edit summary
No edit summary
Line 9:
Then check how our application is behaving and moreover how our system is behaving in these conditions? Are the backup procedures setup for [[emergency situation]] working properly?
 
For running the OAT [[test case]]s, the tester should have exclusive access to the system/ environment. This means that a single tester would be executing the test cases at a single point of time. HereFor breakingOAT thewe system means;should makingdefine the applicationexact dependentOR thingsquality (listedgates; above)Entry inaccessibleand to theExit applicationGate. Like,This stoppingshould the windowlist services,down deletingall the SPactivities inwhich databases, taking thewould DBbe off-linepart and thencovered accessin the system/applicationdifferent phases of testing. So,The thismain clearlyemphasis indicatesshould thatbe thison isthe aoperational destructive typepart of testingthe system.
 
For OAT we should define the exact OR quality gates; Entry and Exit Gate. This should list down all the activities which would be part and covered in the different phases of testing. The main emphasis should be on the operational part of the system.
{{Uncategorized|date=October 2010}}