Content deleted Content added
m r2.7.1) (robot Modifying: vi:Sơ đồ mạng ADM |
Unlinked: Scheduling |
||
Line 1:
'''Arrow Diagramming Method''' (ADM) is a network diagramming technique in which activities are represented by arrows.<ref>CPM in Construction - A Manual for General Contractors(Copyright 1965 by the Associated General Contractors of America)</ref>
It is used for
<br />The precedence relation between activities is represented by circles connecting to one or more arrows. The length of the arrow represents the duration of the relevant activity.
|