Content deleted Content added
→History: added note that PLATINUM technology Acquires LBMS (March 1998) |
|||
Line 114:
Though some of these items may be unfamiliar to you, it is beyond the scope of this unit to go into them in great detail.
'''''Italic text'''''=== Stage 4 - Technical system options ===
This stage is the first towards a physical implementation of the new system. Like the Business System Options, in this stage a large number of options for the implementation of the new system are generated. This is honed down to two or three to present to the user from which the final option is chosen or synthesized.
|