Content deleted Content added
No edit summary |
No edit summary |
||
Line 7:
AEP Texas installed a 100 MW VFT substation in [[Laredo, Texas|Laredo]], Texas, [[United States]] in early 2007. It connects the power systems of ERCOT (in the United States) to CFE (in Mexico). See [http://www.ettexas.com/projects/vft.asp The Laredo VFT Project]
GE installed a 3 x 100 MW VFT substation in Linden, New Jersey, [[United States]] in 2009. It connects the power systems of PJM &
|