Talk:V-model (software development): Difference between revisions

Content deleted Content added
No edit summary
m Reverted 1 edit by 203.91.201.55 (talk) identified as vandalism to last revision by 46.59.76.22. (TW)
Line 7:
 
 
The article describes the V-Model as featuring "verification" along the rightleft (descending or "development") leg, and "validation" along the right (ascending or "deployment") leg. I believe this is a misuse of the terms, verification and validation.
 
Although the following is a simplification, I believe it is not a distortion: