After lengthy negotiation, the signing of the project was on 8 December 1998 and the terminal was open in 22 July 2003.
The delay of project caused substantial losses in Hong Kong in 1990s. The overcongestion in [[Kwai Chung Container Port]] made cargoes go to [[Shekou Industrial Zone|Shekou]] and [[Kaohsiung]] instead of Hong Kong.