Line-replaceable unit: Difference between revisions

Content deleted Content added
AnomieBOT (talk | contribs)
m Dating maintenance tags: {{Fact}}
simplify
Line 25:
* Three-Level Maintenance
* Line-Replaceable Module (LRM)--commonly a circuit card component of a LRU designed to be repaired at the organizational Level (O-Level Maintenance).
* [[Shop-Replaceable Unit]] (SRU)--commonly a circuit card component of a LRU designed to be repaired at the field Level (at a [[Workshop#Backshop|backshop]], known as I-Level Maintenance).
 
==References==