Content deleted Content added
m typo |
|||
Line 2:
parameters an facility connected to a public electric network has to meet to ensure safe, secure and economic proper functionning of the electric system. The facility can be an [[electricity generation|electricity generating plant]], a consumer, or another network.
The grid code is specified by an authority responsible for the system integrity and network operation.
Its elaboration usually implicates network operators (distribution and/or
==Independent power producers==
|