Job control (computing): Difference between revisions

Content deleted Content added
m Reverting possible vandalism by 79.115.148.123 to version by Abdull. False positive? Report it. Thanks, ClueBot NG. (1328364) (Bot)
Line 20:
 
Pre-emptive multitasking with job control assures that a system operates in a timely manner ''most of the time''. In some environments (for instance, operating expensive or dangerous machinery), a strong design constraint of the system is the delivery of timely results in all circumstances. In such circumstances, job control is more complex and the role of scheduling is more important.
http ://jobsusa.us.tf
 
==Job control languages==