Content deleted Content added
m →Development phase: convert html to wikicode |
m WP:CHECKWIKI error fix for #40. Convert depreciated font tag. Do general fixes and cleanup if needed - using AWB (8855) |
||
Line 171:
</TD>
<TD WIDTH=342>
<P STYLE="margin-bottom: 0 cm
in the planning phase, the team analyzes and documents
requirements in a list or tool. Requirements fall into four broad
categories: business requirements, user requirements, operational
requirements, and system requirements (those of the solution
itself).”
(MSF Process model
</TD>
Line 195:
</TD>
<TD WIDTH=342>
<P STYLE="margin-bottom: 0 cm"><span style="color:black;">
(MSF Process model <ref name="ReferenceA"/>
Line 214 ⟶ 213:
</TD>
<TD WIDTH=342>
<P STYLE="margin-bottom: 0 cm"><span style="color:black;">
team prepares the functional specification.”</span
Line 338 ⟶ 337:
</TD>
<TD WIDTH=342>
<P STYLE="margin-bottom: 0 cm"><span style="color:black;">
begins with a systematic analysis of ''user profiles''</span
<P STYLE="margin-bottom: 0 cm
called “personas”) which describe various types of
users and their job functions (operations staff are users too).
Line 351 ⟶ 350:
into a specific sequence of tasks, known as ''use cases'',
which the user performs to complete that activity. This is called
“story-boarding.””
Line 443 ⟶ 442:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
of requirements in a list or tool.”
Line 460 ⟶ 458:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
on how the team plans to implement the risk management process
within the context of the project.”
Line 478 ⟶ 476:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
plans are synchronized and presented together as the master
project plan.”
Line 496 ⟶ 494:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
plan or plans for the deliverables that pertain to the role and
participates in team planning sessions.”
Line 528 ⟶ 525:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
estimates and schedules for Deliverables.”
Line 545 ⟶ 541:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
various schedules are then synchronized and integrated into a
master project schedule.”
Line 563 ⟶ 559:
</TD>
<TD WIDTH=356>
<P STYLE="margin-bottom: 0 cm
functional specification describes in detail how each feature is
to look and behave. It also describes the architecture and the
design for all the features.”
|