Content deleted Content added
Andy Dingley (talk | contribs) m Reverted 2 edits by 208.122.86.126 (talk) to last revision by Smalljim. (TW) |
|||
Line 161:
There is also a cost in training people to use the techniques. The learning curve can be considerable if the full method is used, as not only are there several modelling techniques to come to terms with, but there are also a lot of standards for the preparation and presentation of documents.
In summary, using this methodology involves a significant undertaking which may not be suitable to all projects.thats okay?
==References==
|