Five small variable-frequency [[electrical transformer|transformer]]s with a total power rate of 25 MVA were in use at [[Neuhof Substation]], Bad Sachsa, Germany for coupling power grids of former East and [[West Germany]] between 1985 and 1990.
AEP Texas installed a 100 MW VFT substation in [[Laredo, Texas|Laredo]], Texas, [[United States]] ({{Coord|27|34|13.64|N|99|30|34.98|W|}}) in early 2007. It connects the power systems of [[ERCOT]] (in the United States) to [[Comisión Federal de Electricidad |CFE]] (in Mexico). (See [http://www.ettexas.com/projects/vft.asp The Laredo VFT Project].)
|