Linear scheduling method: Difference between revisions

Content deleted Content added
Alternative names: British English name in the railway and road industry
Yobot (talk | contribs)
m Application: WP:CHECKWIKI error fixes using AWB (10093)
Line 9:
# interruption in on-going process is minimized, including hiring-and-firing; and
# the effect of the [[Experience curve effects|learning curve]] phenomenon is minimized
 
 
==Alternative names==