Assumption-based planning: Difference between revisions

Content deleted Content added
m Critical assumption identification: replaced: best case → best-case using AWB
m Replacing ABP_process.gif with File:ABP_process.png (by GifTagger because: Replacing GIF by exact PNG duplicate.).
Line 46:
 
== Process of Assumption-Based Planning (ABP)==
[[File:ABP processABP_process.gifpng|thumb|320px|Assumption-Based Planning (ABP). The blue part of the figure depicts the process steps of a general assumption-based planning method, the white part identifies the separate deliverables. Every step is described in the assumption-based planning process list displayed below the picture.<ref>The modelling method in general is a result from a method engineering approach as proposed by the [[University of Utrecht]] in its "Method Engineering Encyclopedia"</ref>]]
 
The steps of Assumption-Based Planning (ABP) are: