Content deleted Content added
→Benefits of the Project: presumptively remove content; see talk page |
remove copyright content copied from http://www.academia.edu/3772710/One_cannot_step_into_the_same_river_twice_making_the_Kaladan_Project_people-centred |
||
Line 61:
====Phase-3 Highway within Myanmar====
* Construction of a road highway from [[Paletwa]] to India-Myanmar border for 110 km by [[IRCON International]] is The construction of stretch / component of road in Myanmar is being arranged by MEA and it will have a separate Project Development Consultant
====Phase-4: Highway on Indian side====
* Phase Four is the construction of a
===Framework for Project Implementation===
* The [[Ministry of External Affairs (India)]] (MEA) is the nodal agency on [[India]]n side
* The [[Ministry of Foreign Affairs (Burma)]] (MFA) is the nodal agency on the [[Myanmar]] side.
* Framework Agreement and two protocols (Protocol on Transit Transport and Protocol on maintenance) signed by the two sides on 2nd April 2008.
==Current Status==
Line 82 ⟶ 77:
As of Nov 2014, Indian Minister for North East, General VK Singh said this project is likely to be completed and fully operational by 2016.<ref>[http://www.livemint.com/Politics/lXLGGeFzlUmlc3p5hIuKMP/Highway-linking-India-to-Myanmar-Thailand-likely-by-2016-V.html Highway linking India to Myanmar, Thailand likely by 2016: VK Singh]</ref>
==See
* [[Mago-Thingbu to Vijaynagar Border Road|Arunachal Border Highway]]
* [[Asian Highway Network]]
|