Content deleted Content added
Copyedit lede: "shorter" headways rather than "increased" headways. |
Nick Moyes (talk | contribs) m Randomly fixing typos with Lupins spellchecking tool: postive->positive |
||
Line 2:
The '''Caltrain Modernization Program''' (CalMod) is a $1.9 billion project which will add a [[Positive train control|Positive Train Control]] system, [[Railway electrification system|electrify the main line]] for [[Caltrain]], a [[commuter railroad]] serving cities in the [[San Francisco Peninsula]] and [[Silicon Valley]], and transition from its current [[diesel-electric locomotive]] powered trains to [[electric multiple unit]]s (EMU).
CalMod is divided into two sub-projects: the '''Communications Based Overlay Signal System'''
When complete, CalMod will electrify {{convert|49|mi|km}} of tracks between [[San Francisco 4th and King Street Station|4th and King station]] and [[Tamien Station]]. Funding for the project comes from various federal, state, and local sources, including from the [[California High-Speed Rail|California High-Speed Rail Authority]], which plans to share Caltrain's tracks in the future. Construction contracts for electrification were awarded on July 2016 and [[groundbreaking]] was expected to occur in March 2017, but was delayed when the United States Secretary of Transportation [[Elaine Chao]] indefinitely deferred federal funding just before construction was about to begin. Also in early 2017, Caltrain removed the contractor responsible for implementing CBOSS for failure to perform on-budget and on-schedule. Caltrain plans to complete the project by 2020, after which it plans to use double-decker [[electric multiple unit]] [[Stadler Rail]] trainsets on the electrified route. Some of the diesel locomotives will be retained for service south of Tamien and, potentially, on the [[Dumbarton Rail Corridor]].
|