Talk:Caltrain Modernization Program/GA1: Difference between revisions

Content deleted Content added
GA Review: Edits completed.
References: checked to ref 27
Line 69:
 
: Thanks again for the detailed review and the opportunity to improve the article! Cheers, [[User:Mliu92|Mliu92]] ([[User talk:Mliu92|talk]]) 03:09, 5 September 2017 (UTC)
 
===References===
*''Ref 2: Caltrain electrification project takes symbolic step forward.'' This is used to support an end date of 2021 (a) and 2020 (c), but only 2021 appears in the text.
*''Ref 7: Feasibility Study for Electrifying the Caltrain/PCS Railroad'' is a 25-page pdf, and needs page numbers adding.
*''Ref 9: Draft Caltrain Rapid Rail Study'' is a 66-page pdf, and needs page numbers adding.
*''Ref 14: Caltrain/California HSR Blended Operations Analysis'' is a 92-page pdf, and needs page numbers adding.
*''Ref 17: "Authorizing Approval of the High-Speed Rail...'' is a 9-page pdf, and needs page numbers adding.
Back soon. [[User:Bob1960evens|Bob1960evens]] ([[User talk:Bob1960evens|talk]]) 15:07, 6 September 2017 (UTC)