Advanced Launch System: Difference between revisions

Content deleted Content added
expanding and WLing for space jargon
The program: syntax; grammar; expand jargon; WLs
Line 3:
The '''Advanced Launch System''' (ALS) is a joint [[United States Air Force]] (USAF) and [[National Aeronautics and Space Administration]] (NASA) study which operated from 1987 to 1990. Its aim was to develop a flexible, modular, heavy-lift, high rate space [[launch vehicle]] that could deliver [[payload]]s to Earth [[orbit]] at a tenth the cost of existing [[solid rocket booster|boosters]].
 
==The programBackground==
The '''ALS''' was a joint USAF and NASA study from 1987 to 1990. thatIt beganwas duringan endeavour of the post-challengeryears following the [[Space Shuttle Challenger perioddisaster]]. Colonel John R. Wormington (Brig.retired Gen.,Brigadier General USAF, Ret.) was assigned as Program Director of the Joint Department of Defense and NASA Advanced Launch System Program Office,. locatedLieutenant at Los Angeles, CA AFB (Air Force Base); Lt ColColonel Michael C. Mushala (Maj.retired Gen.,Major General USAF, Ret.) was assigned as his Deputy. ProgramThe Director.program office was located at the [[Los Angeles Air Force Base]].
 
Mushala was promoted to Colonel in October 1989 and became Program Director when Wormington was reassigned as commander of the Eastern Space and Missile Center, Patrick AFB, FL in February 1990. Mushala closed out the program, and the System Program Office (SPO) was disbanded in July 1990. With the remaining propulsion development efforts being managed by NASA alone. Although the project had a projected [[Research_and_development|R&D]] cost of $15 billion, its early cancellation led to a final cost slightly under $3 billion.