System under test: Difference between revisions

Content deleted Content added
Correcting link: Changing ISTQB reference from ASTQB to ISTQB Glossary (test object)
Clarification of the use of SUT, "maturity" and "testing cycle", as they appear to be SW development model specific (i.e. waterfall) rather than general.
Line 3:
A special case of a software system is an [[application software|application]] which, when tested, is called an application under test.
 
The term SUT means also a stage of maturity of the software because a system test is the successor of integration test in the testing cycle.{{clarify |date=December 2017 |reason= maturity and testing cycle appears to refer to a phased-approach to SW development}}
 
== See also ==