Content deleted Content added
Yorkyabroad (talk | contribs) Correcting link: Changing ISTQB reference from ASTQB to ISTQB Glossary (test object) |
Yorkyabroad (talk | contribs) Clarification of the use of SUT, "maturity" and "testing cycle", as they appear to be SW development model specific (i.e. waterfall) rather than general. |
||
Line 3:
A special case of a software system is an [[application software|application]] which, when tested, is called an application under test.
The term SUT means also a stage of maturity of the software because a system test is the successor of integration test in the testing cycle.{{clarify |date=December 2017 |reason= maturity and testing cycle appears to refer to a phased-approach to SW development}}
== See also ==
|