OpenProj: Difference between revisions

Content deleted Content added
Bugs: e3423432
Line 55:
== Bugs ==
As of version 1.4, bugs in the software generally only manifest for users who are attempting more advanced features. For example, tasks may mysteriously start at a certain time (they behave as if they have a 'Start no earlier than' constraint even though none exists, and the project start date is not a constraint), links show gaps, fixed cost for summary tasks neither sums nor is editable, etc. Sometimes these errors are solved by restarting the software, but others are persistent.
Compared to Microsoft Project, which it closely emulates, OpenProj has a similar user interface (UI), and a similar approach to construction of a project plan: create an indented task list or work breakdown structure (WBS), set durations, create links (either by (a) mouse drag, (b) selection and then button-down, or (c) manually type in the 'predecessor' column), assign resources. The columns (fields) are the same as for Microsoft Project. Users of either software should be broadly comfortable using the other. Costsss are the same: labour, hourly rate, material usage, and fixed costs: these are all provided.
 
However, there are small differences in the UI (comments apply to version 1.4), which take some adaptation for those familiar with Microsoft Project, i.e. OpenProj can't link upwards with method (c), inserting tasks is more difficult than in Microsoft Project, and OpenProj can't create resources on the fly (have to create them first in the resource sheet). There are also several more serious limitations with OpenProj, the chief of these being the unavailability of more detailed views and reports typical of Microsoft Project. For example, though the fields exist for cost, there is no quick way to show them other than to manually insert them. This requires a relatively advanced user: someone who knows what the fields might be called and how to use them.