Flow-shop scheduling: Difference between revisions

Content deleted Content added
Undid revision 833834621 by Sarveshbhatnagar (talk) rv linkspam
Moras21 (talk | contribs)
Line 42:
The algorithm is optimal.
 
The detailed discussion of the available solution methods are provided by Malakooti (2013), see [Malakooti] for more detail.
 
==Footnotes==