Flow-shop scheduling: Difference between revisions

Content deleted Content added
Moras21 (talk | contribs)
Moras21 (talk | contribs)
Line 42:
The algorithm is optimal.
 
The detailed discussion of the available solution methods are provided by Malakooti (2013), see [{Malakooti]} for more detail.
 
==Footnotes==