Flow-shop scheduling: Difference between revisions

Content deleted Content added
Moras21 (talk | contribs)
Moras21 (talk | contribs)
Line 42:
The algorithm is optimal.
 
The detailed discussion of the available solution methods are provided by Malakooti (2013), see [[Behnam_Malakooti|Malakooti]] for more detail(2013).
 
==Footnotes==