Content deleted Content added
mNo edit summary |
No edit summary |
||
Line 9:
Because the number of such access nodes is small compared to the overall number of nodes in a road network, all shortest routes connecting those nodes with each other can be pre-calculated and stored. When calculating a shortest path therefore only routes to access nodes close to start and target ___location need to be calculated.
{{Clear}}
== General framework ==
|