Content deleted Content added
m →Certification: Task 16: replaced (1×) / removed (0×) deprecated |dead-url= and |deadurl= with |url-status=; |
|||
Line 13:
==PSP structure==
PSP training follows an evolutionary improvement approach: an engineer learning to integrate the PSP into his or her process begins at the first level – PSP0 – and progresses in process maturity to the final level – PSP2.1. Each Level has detailed scripts, checklists and templates to guide the engineer through required steps and helps the engineer improve
;Process
|