Discrete-event simulation: Difference between revisions

Content deleted Content added
m Reverted edits by 102.167.94.132 (talk) (HG) (3.4.10)
m lc common nouns
Tags: Visual edit Mobile edit Mobile web edit Advanced mobile edit
Line 58:
 
===Diagnosing process issues===
Simulation approaches are particularly well equipped to help users diagnose issues in complex environments. The [[Theorytheory of Constraintsconstraints]] illustrates the importance of understanding bottlenecks in a system. Identifying and removing bottlenecks allows improving processes and the overall system. For instance, in manufacturing enterprises bottlenecks may be created by excess inventory, [[overproduction]], variability in processes and variability in routing or sequencing. By accurately documenting the system with the help of a simulation model it is possible to gain a bird’s eye view of the entire system.
 
A working model of a system allows management to understand performance drivers. A simulation can be built to include any number of [[performance indicator]]s such as worker utilization, on-time delivery rate, scrap rate, cash cycles, and so on.