Trans-Java toll road is a planned toll road across Java from Merak to Surabaya and then to Pasuruan. It may be extended further to the east.
Background
Two centuries ago (1810-1825), Dutch East Indies colonial government has made De Groote Postweg (Post Highway) with 1,000 kilometers lenght between Anyer, Banten province and Panarukan, Situbondo, East Java province. Now, Indonesian government repeated launching the Trans-Java toll road with 897.7 miles lenght between Anyer and Banyuwangi.[1]
Has been fully operated by Marga Mandala Sakti. Although has been operated since 1981, the toll road is still in loss condition due to not achieved predicted traffic as planned.
Has been fully operated by Jasa Marga.
Jakarta Ring Toll Road
Jakarta Inner Ring Toll Road is not connected directly (through non-toll road) with Tangerang-Jakarta Toll Road at Tomang, but connected directly with Jakarta-Cikampek Toll Road at Cawang/Halim. Wether Jakarta Outer Ring Toll Road connected with Tangerang-Jakarta Toll Road at Kebun Jeruk and connected with Jakarta-Cikampek Toll Road at Cikunir. Section Penjaringan-Kebun Jeruk has been operated by PT Nusantara Infrastructure Tbk (IDX:META).
Has been fully operated by Jasa Marga. The west part of toll road near Jakarta consists of 4 lanes and 3 lanes for other direction. The most profitable toll road, although launched after Jagorawi Toll Road and Jakarta-Tangerang Toll Road above. PT Lippo Cikarang Tbk will build a new gate tollroad at km 34.700 with 1.2 kilometers access road to their area and then given it to Jasa Marga for operating at end of 2011. The previous gate will still function is located at km 28.0.
The 116 kilometers length of Cikampek-Palimanan toll road would run through Cikopo (Cikampek), Kalijati, Subang, Cikedung, Kertajati, Sumberjaya and Palimanan. Investor is PT Lintas Marga Sedaya.[2] More than 90 percent of land acquisition has been done. It will commences to construct at April 2011 and will open at 2013. If it has been finished, so from Merak to Kanci (below) will all of toll road.
Has been fully operated by Jasa Marga
Has been fully operated by PT Bakrie Toll Road, a subsidiary of PT Bakrieland Development Tbk (IDX:ELTY).[3]
Consession by PT Bakrie Toll Road owned by Aburizal Bakrie. The length of toll road is 57 kilometers with cost Rp.250 billion.[4]
At as February 2011 land acquisition was only 3 percent. A consession by PT Pemalang Batang Toll Road with total lenght of 39 kilometers.[5]
Consession by PT Bakrie Toll Road owned by Aburizal Bakrie. The length of toll road is 75 kilometers with cost Rp.550 billion.[6] It consists of five sections and as of February 2011 land acquisition of Section-1 was 62 percent, whether the others none. The consession by PT Bakrie Toll Road is on dispute due to PT Bakrie Toll Road only yet pay the first instalment from six instalment to the previous owner consession. For temporary the project is halted until the dispute is resolved. Re-evaluation have been completed and all other 23 projects from 24 projects will start signing their contract amendments, except for Batang-Semarang toll road.[7]
75.7 kilometers length. Land acquisition as at February 2011, Section Semarang-Ungaran was 96 percent, Section Ungaran-Bawen was 72 percent, wether Section Bawen-Solo is still under feasibility studies. Although all of land acquisitions not yet finished, the road construction has been commenced. Due to construction is follows land acquisition, Semarang-Solo toll road section E1 (Tembalang-Ungaran) of 11.2 kilometers will be operated before end of 2011. It will be operated by Jasa Marga.[8]
Land acquisition as at February 2011 was 34 percent. Although all of land acquisitions not yet finished, the road construction has been commenced.
The lenght of toll road is 37 kilometer.[9]
The lenght of toll road is 87 kilometer.[10] Land acquisition as at February 2011 was 27 percent.
The lenght of toll road is 40.5 kilometers with consession by PT Marga Hanurata Intrinsic.[11] Land acquisition as at February 2011 was 67 percent. Although all of land acquisitions not yet finished, the road construction has been commenced.
Length of the toll road is 36.1 kilometers and known also as Sumo (Surabaya-Mojokerto) toll road. Land acquisition as at February 2011 was 40 percent. Although all of land acquisitions not yet finished, the road construction has been commenced by Jasa Marga. Mei 2011: Until now process of acquisition of minority shareholders by Jasa Marga is still on going, but consequently for temporary land of acquisitions process is halted and also the constructions.[12]
Has been fully operated by Jasa Marga, but only until Porong, because of Lapindo Mudflow. So, there are a new Porong-Gempol Toll Road relocation with length of 10 kilometers.[13]
Will construct and will be operated by Jasa Marga & Trans Marga Jatim Pasuruan.[14] The length of the toll road is 32 kilometers.
Consession by PT Bakrie Toll Road owned by Aburizal Bakrie. The length of the toll road is 45 kilometers .
The length of the toll road is 156 kilometres.
References
- ^ http://www.indonesiaindonesia.com/en/f/12699-observing-the-trans-java-toll-road/
- ^ http://www.thefreelibrary.com/Development+of+toll+roads+in+Indonesia.-a0220639605
- ^ http://jatim.gresnews.com/ch/Mojokerto/cl/Jasa--Marga/id/2132872/read/1/Bakrie-JSMR-Bidik-Peluang-Infrastruktur-di-Jatim
- ^ http://theindonesiatoday.com/bonds-headline/3556-bakrie-toll-to-secure-rp800-billion-public-services-assistance-funds.html
- ^ Pemalang Batang Toll Road
- ^ http://theindonesiatoday.com/bonds-headline/3556-bakrie-toll-to-secure-rp800-billion-public-services-assistance-funds.html
- ^ http://www.thejakartapost.com/news/2011/04/25/%E2%80%98made-indonesia%E2%80%99-airport-construction-may-last-forever.html
- ^ http://www.indii.co.id/news_daily_detail.php?id=203
- ^ http://jatim.gresnews.com/ch/Mojokerto/cl/Jasa--Marga/id/2130876/read/1/Pemerintah-Dorong-Pembangunan-Jalan-Tol
- ^ (Indonesian) Ngawi-Kertosono Toll Road
- ^ PT Marga Hanurata Intrinsic
- ^ http://m.inilah.com/read/detail/45967/wika-tunggu-pembebasan-lahan-tol-sumo
- ^ http://www.theindonesiatoday.com/stocks/2989-jasa-marga-to-spend-rp16-trln-for-toll-road-projects-in-h2.html
- ^ http://www.jasamarga.com/en/press-release-/109-jasa-marga-plans-acquisition-of-55-mna-stocks-to-complete-the-surabaya-mojokerto-toll-road.html