MODIS Lunar Calibration Roll Maneuver, A
-
- Posts: 97
- Joined: Fri Jan 30, 2004 9:11 am America/New_York
MODIS Lunar Calibration Roll Maneuver, A
Below is the notification letter for the MODISLunar Calibration Roll Maneuver scheduled forFriday, April 30, 2004 (DOY - 121).MODIS Lunar Calibration Roll Maneuver, April 30, 2004 (DOY 121)Type of Maneuver: _X_Roll Maneuver -6.9795 (deg) Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Â Time of Maneuver:April 30, 2004 (DOY 121)Slew Start: 17:04:14 (Slight loss of ptg accuracy begins)Slew Complete: 17:10:38Data Collect Begin: 17:12:38Slew Return Start: 17:19:08 (Data Collect End time)Slew Complete: 17:25:32Regain Ptg Accuracy: 17:30:32Orbit Number: 10594Slew Time: 6 min 23.32 secSettle: 2 minutesSlew Angle: -6.9795 degrees Maneuver Contacts:Before Maneuver AGS AOS 16:48:10 LOS 16:58:00During Maneuver 275 AOS 17:17:00 LOS 17:31:57After Maneuver TDE AOS 17:51:52 LOS 18:11:04
Filters: