List of Singapore MRT lines
editThe Mass Rapid Transit (MRT) system is a rapid transit system in Singapore and the country's principal mode of transport. Owned by the Land Transported Authority (LTA), there are 151 stations served by the system. The system has two operators: SMRT trains and SBS transit. SMRT operates the North–South, East–West, Circle, and Thomson–East Coast lines whilst SBS operates the North East and Downtown lines.
svf.
There are 6 operational lines on the MRT system. The NSL is the first line to open and goes from Jurong East to Marina South Pier. (add line descriptions).
List
edit NSl
In operation
editName | Opened | Section | Length | ||||
---|---|---|---|---|---|---|---|
English[1] | Malay[2] | Chinese[3] | Tamil[4] | ||||
North–South | Utara–Selatan | 南北 | வடக்கு தெற்கு | 4 November 1989 (split from the initial MRT system) | Yishun–Marina Bay | ||
10 February 1996 (incorporation of the Branch line) | Yishun MRT station–Jurong East | ||||||
23 November 2014 (extension to Marina South Pier) | Marina Bay–Marina South Pier | ||||||
2 November 2019 (opening of Canberra) | Sembawang–Yishun | ||||||
East–West | Timur–Barat | 东西 | கிழக்கு மேற்கு | 4 November 1989 (split from the initial MRT system) | Tanah Merah–Lakeside | ||
16 December 1989 (extension to Pasir Ris) | Tanah Merah–Pasir Ris | ||||||
6 July 1990 (opening of Boon Lay) | Lakeside–Boon Lay | ||||||
18 October 2001 (opening of Dover) | Buona Vista–Clementi | ||||||
10 January 2001 (opening of Expo on the Changi branch) | Tanah Merah–Expo | ||||||
8 February 2002 (extension to Changi Airport) | Expo–Changi Aiport | ||||||
28 February 2009 (Boon Lay extension) | Boon Lay–Joo Koon | ||||||
18 June 2017 | Joo Koon–Tuas Link | ||||||
North East | Timur Laut | 东北 | வடக்கு கிழக்கு | 20 June 2003 | HarbourFront–Punggol | ||
15 Janurary 2006 | |||||||
20 June 2011 | |||||||
10 December 2024 | Punggol–Punggol Coast | ||||||
Circle | Circle | 环线 | இணைப்பு | 28 May 2009 | Bartley–Marymount | ||
17 April 2010 | Bartley–Dhoby Ghaut | ||||||
Marymount–HarbourFront | |||||||
Promenade–Marina Bay | |||||||
Downtown | Pusat Bandar | 滨海市区 | டவுன்டவுன் | ||||
Thomson–East Coast | Thomson—Pantai Timur | 汤申—东海岸 | தாம்சன் - ஈஸ்ட் கோஸ்ட் |
Under construction
editName | Planned opening date | Section | Length | ||||
---|---|---|---|---|---|---|---|
English[1] | Malay[2] | Chinese[3] | Tamil[4] | ||||
Circle | Circle | 环线 | இணைப்பு | First half of 2026 | HarbourFront–Marina Bay | ||
Downtown | |||||||
Thomson–East Coast | |||||||
Jurong Region | |||||||
Cross–Island |
Planned
editName | Expected date of opening | Section | Length | ||||
---|---|---|---|---|---|---|---|
English[1] | Malay[2] | Chinese[3] | Tamil[4] | ||||
North–South | Utara–Selatan | 南北 | வடக்கு தெற்கு | ||||
Circle | Circle | 环线 | இணைப்பு | ||||
Thomson–East Coast |
Closed
editName | Opened | Section | Length | Date of closure | Outcome of closure | ||||
---|---|---|---|---|---|---|---|---|---|
English[1] | Malay[2] | Chinese[3] | Tamil[4] | ||||||
Initial MRT system | 7 November 1987 | Yio Chu Kang–Toa Payoh | Split into the NSL and EWL | ||||||
12 December 1987 | Toa Payoh–Outram Park | ||||||||
12 March 1988 | Outram Park–Clementi | ||||||||
5 November 1988 | Clementi–Lakeside | ||||||||
20 December 1988 | Yio Chu Kang–Yishun | ||||||||
Branch line | Jurong East–Choa Chu Kang | 10 February 1996 | Merged with the NSL under the Woodlands Extension |
- ^ a b c d "System Map" (PDF). Land Transport Authority. 23 June 2024. Archived (PDF) from the original on 4 June 2025. Retrieved 23 June 2024.
- ^ a b c d "System Map" (PDF) (in Malay). Land Transport Authority. 21 July 2025. Archived (PDF) from the original on 14 July 2025. Retrieved 21 July 2025.
- ^ a b c d "System Map" (PDF) (in Chinese). Land Transport Authority. Archived (PDF) from the original on 10 December 2024. Retrieved 20 December 2024.
- ^ a b c d "System Map" (PDF) (in Tamil). Land Transport Authority. Archived (PDF) from the original on 13 December 2024. Retrieved 20 December 2024.